3/5/07 - Press release sent out, establish finance procedures, $25 fee due
3/8/07 - Construction and lighting plans finalized, material list compiled, UCF focused press release, $25 FEES DUE!
3/9/07 - Label information compiled, sales price list etc, distribution of material list
3/10/07-3/18/07 - SPRING BREAK
3/14/07-3/22/07 - Distribute flags
3/20/07 - Home Depot materials shopping list finalized
3/22/07 - Trip to Home Depot, sign up driver list, pick up wall-framing materials
3/23/07 - Pre-cut lumber to length
3/25/07 - Load in materials to 801
3/26/07 - INSTALL, posts in ground, framing for partitions, drywall hung
3/27/07 - INSTALL, drywall seamed, electrical work, paint
3/28/07 - INSTALL, pick up generator, lay sod
3/29/07 - INSTALL, work on walls etc (MORNING)
3/29/07-3/31/07 - EXPOSED: A 30-Artist Takeover
4/1/07 - Load out of 801
Showing posts with label CALENDAR. Show all posts
Showing posts with label CALENDAR. Show all posts
Thursday, April 5, 2007
Subscribe to:
Posts (Atom)